OUTRAGE 18: Rigging E-TEC 150 with ICON EST and ICON Pro gauges
Posted: Wed May 04, 2016 5:53 pm
My 1986 Outrage 18 started life with a 1986 Yamaha 150. I had a tachometer and a trim gauge. The Yamaha was still running strong, but a 30-year-old motor that has spent almost half its life in saltwater was just stretching my luck. I boat mostly a section of the North Coast of California with sometimes many miles between ports and always rocky shores.
I took advantage of Evinrude's promotion of a seven-year warranty and discounted rigging. I opted for the electronic shift and throttle (EST) package with ICON Pro 3.5-inch gauges. I added water pressure, engine temperature and trim in 2-inch gauges. I also added the auxiliary battery charging system.
I am particular about my rigging and of the two Platinum Evinrude dealers in Northern CA neither could understand how I wanted my rigging accomplished, so I decided to do the rigging myself and have the dealer hang the engine and make all the connections.
I had both a NEMA 0183 and 2000 networks running already. My VHF radio and my Garmin chart plotter communicate via NMEA-0183. The Garmin chart plotter and my Garmin 600 AIS communicate via NMEA-2000 network. To keep everything in a neat package (and since at age-58 I can’t easily fit into the console to work and mount things) I had built a “box” that mounted the networks, electronics power distribution, VHF and AIS into one package that could be slipped into the pocket in front of the fire extinguisher box at the front of the console. My VHF is a remote microphone model and all controls are operated from the microphone.
I needed to extend the NEMA-2000 network to accept the new network T-connectors for the ICON Pro gauges. Evinrude wants to power the network from the key switched 12-Volt terminal. The NEMA 2000 network was already powered by my Garmin chart plotter, and I wanted to be able to use the chart plotter,depth finder, and AIS with the engine key off. So I removed the terminator and added an extension cable to a Garmin power isolator to break up the network power. One side is powered by the Garmin chart plotter the other by the Evinrude gauges. As I had already read in one of Jimh’s articles, the Lowrance T-connectors and the Garmin T-connectors have some different mounting characteristics, so I used all Garmin T-connectors to keep everything nice and neat.
There were a bunch of other pieces that had to be installed in the console:
--the gateway (Evinrude network to NEMA 2000 network)
--a power switching relay
--fuses, and
--the Evinrude ESM-network hub.
I mounted all of this equipment and the NMEA-2000 network extension on a board that is mounted on the side of the console behind the fire extinguisher box. I routed the backbone for the Evinrude ESM-network out of the console, under the deck, and over the fuel tank, to the panel on the starboard side of the boat (I’m not sure what that panel is called, I have one on both sides adjacent to the console). The cable from the engine to the hub is 15-feet long and it’s less than 10-feet to the hub. The best thing is it’s in a nice dry spot.
The oil tank is in the console with the oil line and sensor wires routed through the rigging tunnel. The oil line and sensor wires were long enough to make it to the stern easily.
I had to manufacture a new instrument panel. I had some sheet aluminum (from an old street sign). I striped the paint, cut to size with my Skill saw, and filed the edges smooth. I cut the proper holes with my drill press and the correct size hole saws (3-1/8-inch and 2-1/8-inch). I painted the panel with zinc-chromate primer and then with black wrinkle paint. To get the wrinkle paint to wrinkle with consistent small wrinkles, I had to cure the painted panel in a 200-degree oven for an hour. The Outrages of that era had a black vinyl panel between the two metal instrument panels. I found some peel and stick sign vinyl that looked very close.
The ETS top-mounting control was a close size to the old Yamaha binnacle. It looked like I could get all the old hole covered with the new binnacle. The only problem was that none of the new mounting hole hit anything. I added some backing where the old hole was, filled the hole with a plywood sandwich that was the correct size and filled everything up with epoxy. When everything was setup, I cut a new hole with a 3-inch hole saw and drilled the three mounting holes.
I also put in new, CG-approved fuel lines with my new Oetiker clamp kit, from the fuel tank to the water separator, and from the water separator to the new primer bulb.
I took advantage of Evinrude's promotion of a seven-year warranty and discounted rigging. I opted for the electronic shift and throttle (EST) package with ICON Pro 3.5-inch gauges. I added water pressure, engine temperature and trim in 2-inch gauges. I also added the auxiliary battery charging system.
I am particular about my rigging and of the two Platinum Evinrude dealers in Northern CA neither could understand how I wanted my rigging accomplished, so I decided to do the rigging myself and have the dealer hang the engine and make all the connections.
I had both a NEMA 0183 and 2000 networks running already. My VHF radio and my Garmin chart plotter communicate via NMEA-0183. The Garmin chart plotter and my Garmin 600 AIS communicate via NMEA-2000 network. To keep everything in a neat package (and since at age-58 I can’t easily fit into the console to work and mount things) I had built a “box” that mounted the networks, electronics power distribution, VHF and AIS into one package that could be slipped into the pocket in front of the fire extinguisher box at the front of the console. My VHF is a remote microphone model and all controls are operated from the microphone.
I needed to extend the NEMA-2000 network to accept the new network T-connectors for the ICON Pro gauges. Evinrude wants to power the network from the key switched 12-Volt terminal. The NEMA 2000 network was already powered by my Garmin chart plotter, and I wanted to be able to use the chart plotter,depth finder, and AIS with the engine key off. So I removed the terminator and added an extension cable to a Garmin power isolator to break up the network power. One side is powered by the Garmin chart plotter the other by the Evinrude gauges. As I had already read in one of Jimh’s articles, the Lowrance T-connectors and the Garmin T-connectors have some different mounting characteristics, so I used all Garmin T-connectors to keep everything nice and neat.
There were a bunch of other pieces that had to be installed in the console:
--the gateway (Evinrude network to NEMA 2000 network)
--a power switching relay
--fuses, and
--the Evinrude ESM-network hub.
I mounted all of this equipment and the NMEA-2000 network extension on a board that is mounted on the side of the console behind the fire extinguisher box. I routed the backbone for the Evinrude ESM-network out of the console, under the deck, and over the fuel tank, to the panel on the starboard side of the boat (I’m not sure what that panel is called, I have one on both sides adjacent to the console). The cable from the engine to the hub is 15-feet long and it’s less than 10-feet to the hub. The best thing is it’s in a nice dry spot.
The oil tank is in the console with the oil line and sensor wires routed through the rigging tunnel. The oil line and sensor wires were long enough to make it to the stern easily.
I had to manufacture a new instrument panel. I had some sheet aluminum (from an old street sign). I striped the paint, cut to size with my Skill saw, and filed the edges smooth. I cut the proper holes with my drill press and the correct size hole saws (3-1/8-inch and 2-1/8-inch). I painted the panel with zinc-chromate primer and then with black wrinkle paint. To get the wrinkle paint to wrinkle with consistent small wrinkles, I had to cure the painted panel in a 200-degree oven for an hour. The Outrages of that era had a black vinyl panel between the two metal instrument panels. I found some peel and stick sign vinyl that looked very close.
The ETS top-mounting control was a close size to the old Yamaha binnacle. It looked like I could get all the old hole covered with the new binnacle. The only problem was that none of the new mounting hole hit anything. I added some backing where the old hole was, filled the hole with a plywood sandwich that was the correct size and filled everything up with epoxy. When everything was setup, I cut a new hole with a 3-inch hole saw and drilled the three mounting holes.
I also put in new, CG-approved fuel lines with my new Oetiker clamp kit, from the fuel tank to the water separator, and from the water separator to the new primer bulb.